Unit Analysis & Site Due Diligence
Walkthrough before you commit: occupant load, exiting, washroom count, ceiling height, and the existing mechanical and electrical capacity of the unit.
Everything between an empty shell and an occupancy permit — carried by one office, in Metro Vancouver.
Walkthrough before you commit: occupant load, exiting, washroom count, ceiling height, and the existing mechanical and electrical capacity of the unit.
Test fits and space planning measured against your business model — how many seats, chairs, treatment rooms or workstations the space will actually hold.
A budget at concept and a refined figure at permit set, so the landlord allowance conversation happens with real numbers.
Full permit and construction drawing sets — plans, reflected ceiling plans, sections, details and schedules.
BC Building Code review, Part 3 / Part 9 determination, spatial separation, sprinkler and mechanical coordination with our consulting engineers.
Submission, tracking, and every round of municipal comments answered until the permit is issued.
Finishes, millwork, lighting and material selections coordinated inside the permit set rather than bolted on afterwards.
Structured cabling, server, security and AV rough-in located while the walls are still on paper.
Site reviews, RFIs, change orders and close-out.
Specification, procurement and install scheduling so furniture lands the week you receive occupancy.
We look at the unit before the lease is firm and tell you what it will cost to make it work — occupant load, exiting, washrooms, ceiling height, mechanical and electrical capacity.
Test fits, finishes and an estimate you can take to the landlord allowance conversation.
BC Building Code analysis, an engineered set, submission, and every municipal comment answered until the permit is issued.
Site reviews, RFIs and close-out through to final inspection.
Almost always. Moving walls, changing plumbing, altering exiting or changing what the space is used for all require a building permit in Metro Vancouver. Cosmetic work — paint, flooring, like-for-like fixtures — generally does not.
Preparation is usually a few weeks. The review cycle at the municipality is the longer part, and it varies by city and by how complete the first submission was. We check the current queue with the municipality when we scope a project rather than quote a number that goes stale.
It applies whenever the space will be used for something different from its current legal use — a retail unit becoming a clinic, an office becoming a restaurant. It usually triggers new requirements for exiting, washrooms, ventilation and accessibility, even if nothing physical changes.
Yes, and we would rather you asked before than after. A unit feasibility check covers occupant load, exiting, washroom counts, ceiling height and what the existing services can carry. It is free and it takes a walkthrough.
We apply as your authorized agent. The city corresponds with us rather than with you, comments get answered the same week, and we carry responsibility for the drawings we submit.
Yes. We produce concept budgets and permit-set updates in the form an allowance conversation needs, and we will tell you early if what you want does not fit what is on offer.
We do. Structural, mechanical, electrical and fire consultants are coordinated as part of our permit and design packages rather than billed as a separate service.
Every city in the region runs permits differently. These cover what is actually true of each one.
What changes when the space becomes a clinic, a restaurant, a daycare, a studio or an office.